3.4 BIM
Roles and Responsibilities
It is the responsibility of all Consultants and Contractors to have or
obtain, at their cost, the trained personnel, hardware, and software needed to
successfully complete the BIM coordination phase of the project. Equipment used
by the subcontractors during the on-site coordination meetings must meet the
requirements of the software being implemented so as not to cause delays in
modeling and redraw. Individuals assigned to the following project roles shall
have the minimum qualifications and responsiblities outlined below.
3.4.1
Design Team BIM Facilitator
As part of the execution of the Design BIM Work Plan, Project Team
shall assign an individual to the role of Design Team BIM Facilitator. The
indivudal shall have at least 3 years of BIM experience and shall have relevant
proficiency in proposed BIM Authoring and Coordination Software. This individual
and their qulaifications shall be approved by LACCD and shall serve as the main
point of contact with LACCD and the Project Team for BIM related issues.
Assigned responsibilities shall be as follows:
a. Ensure compliance with Design BIM
Work Plan
b.
Coordinate
Project-wide training sessions with LACCD BIM Coordinator
c.
Coordinates
software training and establishes protocol for efficient use of software
d.
Coordinate
set up of shared file server with LACCD and Project Team IT staff. This shall
include interfacing with Project team IT staff to set up web portal,
permissions, etc. If there is a District wide portal, individual shall
coordinate with District wide IT Administrator for permissions and set up
e.
Assembles
composite design model for coordination meetings
f.
Provide
Modeling Quality Control / Quality Assurance Check of Design BIMs.
g.
Facilitates
use of composite design model in design coordination meetings
h.
Ensures
that BIMs are used appropriately to test design requirements / criteria
i.
Interfaces
with Project team BIM and IT Managers to ensure software is installed and
operating properly
j.
Interfaces
with software developers to provide feedback and bug reports
k.
Provides
specifications for “BIM Coordination Room” to LACCD for approval
l.
Facilitates
BIM Technical meetings with Lead BIM Technicians
m.
Ensure
Design Team understands, supports, and meets LACCD Vision and Main Objectives
for BIM (ref. Section 1.2)
n.
Ensure
the shared geo-reference points noted in Section 2.4.5 are distributed and used
by ALL team members.
o.
Interfaces
with LACCD’s e7 studio for data and file exchange as needed
p. Coordinate BIM File Exchange and
archiving of Milestone Submittals
3.4.2
Lead BIM Technicians
a. All major design trades shall assign
an individual to the role of lead BIM Technician for the duration of the
project. These individuals shall have at least 2 years of relevant BIM
experience and shall have the following responsibilities:
1.
lead the internal project team BIM in its
documentation and analysis efforts
2.
Interface with Design BIM Facilitator for BIM
related meetings and issues
3.
Coordinate internal project team training as
required
3.4.3
Construction BIM Facilitator
As part of the execution of the Construction BIM Work Plan, General
Contractor shall assign an individual to the role of Construction BIM
Facilitator. This individual shall have at least 2 years of relevant BIM
experience and shall have the ability to utilize the BIM software to help
identify constructability issues. Assigned responsibilties shall be as follows:
a. Main point of contact between LACCD
BIM Coordinator and Construction Team for BIM related issues.
b.
Prior
to and during Construction, interface with Campus IT to establish and maintain
shared portal access and permissions
c.
Prior
to commencing construction, coordinates Sequencing and Scheduling is integrated
with Construction Record BIM
d.
Communicates
to design team, the data extraction sets required by the construction team and
ensures that these requests are met
e.
Coordinate
with design team to ensure design changes in the field have been documented and
are updated in the Design Record BIM in a timely manner
f.
Prior
to approval and installation, work with Lead Fabrication Modelers to integrate
3D fabrication models with updated design composite model to ensure compliance
with design intent
g.
Coordinates
update of as-built conditions in the Construction Record BIM
h.
Ensures
record documentation noted in Document Submission Standards are properly linked
to Construction Record BIM for final submittal to LACCD
i.
Coordinates
software training and establishes protocol software for Construction Team for
efficient use of
j. Provides specifications for General
Contractor’s “BIM Coordination Room” to LACCD for approval
Ensures Construction Team has necessary hardware and BIM Software properly
installed and accessible for project use.